Filmore Avenue Complete Street Reconstruction

Client: City of New Orleans Department of Public Works
Location: New Orleans, LA

Sector: Infrastructure
Services Provided: Civil Engineering, Construction Administration, & Resident Inspection


Infinity identified and quantified damages to the roadways, driveway aprons, sidewalks, curbs, and drainage structures within the Filmore Neighborhood of New Orleans. The scoping report created by Infinity included the descriptions of eligible repairs, photo documentation, and justification of the repairs to aid the City of New Orleans in obtaining FEMA grant funding. Additionally, Infinity provided construction administration and resident inspection for the project through the final stages of the project.

Spanning over 1000 linear feet, the Filmore Avenue project was a complete street reconstruction. Infinity’s roadway designs included the following:

• Replacement of concrete, asphalt, and composite pavements in patches and/or full blocks
• Replacement of existing 4 f.t. and 5 f.t. wide sidewalks and driveway aprons
• Replacement of existing mountable barrier and/or granite curbing
• Roadway lane striping and signage
• Addition of bike lanes with appropriate striping

Additionally, Infinity provided designs for new domestic sewer, water, and drainage. The drainage designs included the following:

• Designs for full drainage line replacement with the addition of catch basins and drain inlets
• Establishment of new grade lines to tie the new systems into the existing lines
• Establishment of proposed grade line (PGL) and inverts


Braithwaite Auditorium & Community Center

Dillard University Campus Improvements